Storage facitility constructions in the Aube department

Similar project

CIGEO – Thermal simulations:

CIGEO, (Industrial centre for geological storage of HA and MA-VL waste) – Evaluation of the warming due to the heat given off by radioactive waste and its impact on the project.

 

Storage facitility constructions in the Aube department

Project and execution studies of the constructions of Phase 8 of the CSFMA.

Projet : 

ISL has carried-out optimisation studies of the CSFMA construction, before the realisation of Phase 3. Consequently, ISL has carried-out project and execution studies for the construction of Phases 3 and 8 as well as studies related to the construction of storage facilities for EDF reactor tank covers. The calculations include seismic calculations for which the filling behaviour has been approached.

Le projet
Pays/région : 
France
Client: 
ANDRA
Période : 
2008-2009